Construction of boiler room and cogeneration installation on alternative fuel on the basis of boiler room «Salve»

Odesa city council
$
Investment amount, USD
Region Odesa
Sector Administrative and auxiliary services
Location Odesa
Opportunity Project financing, foreign direct investment, credit funds and other sources
Status Project proposal
Actions
Share project

Construction of a biomass thermal power plant on the basis of the existing «Salve» boiler house with the generation of electricity generated at a “green” tariff.

Characteristics of the cogeneration unit: electric power – 1.5 MW, thermal power – 5 MW. Electric capacity for electricity supply 1.2 MW, Annual heat output – 7.1 thousand Gcal.

The implementation of the project will reduce the energy dependence of the neighborhood and provide it with a reliable source of heat supply.