New construction of household sewerage on the streets of Ovidiopolska, Izmailska, Tykha, Lyubashivska, Baltska, Kodymska Zlagoda, Chervonokhutorska, Smerekova h/m “Chornomorka-2”, village Limanka

Tairovska settlement council Odesa district
$
Investment amount, USD
Region Odesa
Location streets of Ovidiopolska, Izmailska, Tykha, Lyubashivska, Baltska, Kodymska Zlagoda, Chervonokhutorska, Smerekova h/m "Chornomorka-2", village Limanka
Status Stage of implementation (project)
Actions
Share project
New construction of household sewerage on the streets of Ovidiopolska, Izmailska, Tykha, Lyubashivska, Baltska, Kodymska Zlagoda, Chervonokhutorska, Smerekova h/m

The urgent problem of the Tairovska community is the lack of high-quality disposal of sewage, which is connected with the active development of the adjacent territory of the Tairov community, the increase in the number of new subscribers (including IDPs) and the wear and tear of sewage pipes (a significant amount of household sewage enters the soil and pollutes the environment environment).

Subscribers connected to household sewage as of 01.10.24: 14,000 people, taking into account the expansion of connected subscribers, of which 3,256 are IDPs, who have been living in the territory since the beginning of the full-scale war. The existing pipeline system is worn out and in an unsatisfactory condition (the service life is already more than 30 years). Electric networks are outdated and in a state of emergency.

The existing sewage networks and separate premises on the listed streets are in an emergency and unsatisfactory condition. Therefore, a decision was made regarding the construction of household sewage on the streets of Ovidiopolska, Izmailska, Tykha, Lyubashivska, Baltska, Kodimska Zlagoda, Chervonokhutirska, Smerekova h/m “Chornomorka-2”, village. Limanka. 

According to the conclusion of the expert report No. 01/0013Ю-03/24 dated 01.03.24, the project implementation period is 11 months. 

A complete set of design documentation is available: design and estimate documentation, feasibility study, expert report No. 01/0013Ю-03/24 dated 01.03.24, design tasks. 

Technical indicators: 
The length of the route of the water supply network: – 19 m.p 
Throughput capacity – 0.85 thousand m3/day 
The length of the sewage network route: – 4732.7 m.p 
Total length of pipelines: – 10696.2 m.p 
The total length of pipe laying is 5620.7 m.p.