Ownership right: communal Area: 5.7 ha (greenfield construction)
Final objective: replacement of natural gas and creation of local power generating facilities
A waste processing plant was commissioned in Zhytomyr at the end of 2022. It processes 100,000 tons of solid household waste annually and creates 36,000 tons of RDF fuel (fuel from waste).
Additionally, the Zhytomyr oblast and city have bioenergy resource potential:
- the total area of forest land is 1,094.4 thousand hectares;
- the region’s overall stock of forest enterprises is 164.2 million m3;
- agricultural businesses utilise more than 550,000 hectares of land for crop production in the region;
- about 40% of agricultural residues, which are left after harvesting the crops, are simply burned.
We offer the investment project “Construction of a combined heat and power plant (working on RDF fuel and biomass) at the address: 132 Koroliova Str., Zhytomyr)”.
Plant capacity:
- heat – 30.0 MW
- electric power – 10.0 MW
Taking into account the current legislation of Ukraine as well as the current tariff for district heating services in Zhytomyr, the city is ready to purchase: -heat – 32.7 EUR/MWh (excluding VAT); -electric power – 125.0 EUR/MWh (excluding VAT).
More opportunities in Zhytomyr region
More opportunities in Fuel and Energy
Invest in Ukraine now
In case you have any questions about the Investment Map or would like to receive advice on investment opportunities, please contact us at join@gb4u.org