Establishment of an industrial park 

Balta City Council of Odesa Region
$
Investment amount, USD
Region Odesa
Location 66160, Ukraine, Odesa Region, Podilsk District, village Bilyne
Opportunity private investment and / or public-private partnership
Status Project idea
Actions
Share project
Establishment of an industrial park 

The north of Odesa region is traditionally an agricultural region. Processing enterprises are far from the places where raw materials are grown, which affects the increase in the price of final processing products.   

The creation of an industrial park to accommodate primary and secondary processing of agricultural raw materials will significantly reduce the cost of the final product, and the availability of a raw material base will ensure a stable production process.   

The main productions on the territory of the industrial park can be an oil extraction plant with the possibility of biofuel production, an enterprise for the production of pasta and cereals, canned vegetables and fruits, compound feed, as well as products from agricultural waste – building panels, pellets, etc. It is also possible to place other industries on the territory of the park, in particular, the production of agricultural machinery. 

On the territory of the industrial park with an area of ​​18.8141 hectares (cadastre numbers and area of ​​land plots: 5120680800:01:001:0942 – 9.493 hectares, 5120680800:01:001:0944 – 8.6429 hectares, 5120680800:01:001:0951 – 0.6782 hectares) can accommodate up to 30 medium and small innovative businesses that will create up to 500 new jobs. Purpose of land plots: 11.02 For placement and operation of main, ancillary and auxiliary buildings and structures of enterprises of processing, machine-building and other industries. 

Distances:  

  • to the district center – 24 km. (Podilsk);  
  • to the regional center – 237 km (Odesa);  
  • to highway M 05 Kyiv-Odesa – 62 km (Kryve Ozero);  
  • to the Balta railway station of the Odesa Railway – 2 km.  

Communications:  

  • The distance to the operating gas pipeline is 2 km,  
  • The distance to the current gas distribution station (GDS) is 10 km,  
  • The distance to the current power line (PL) is 0.1 km  
  • The distance to the possible place of connection to the existing water supply is 1.4 km  
  • Water drainage (sewage) – local sewage. Mobile phone coverage – Vodafone, Kievstar, Life. 

The city council is ready to assist in attracting business to carry out activities in the territory of the industrial park, including by providing tax benefits for local taxes and fees.

Invest in Ukraine now

In case you have any questions about the Investment Map or would like to receive advice on investment opportunities, please contact us at  [email protected]