Clinker kiln modernization project

Kryvyi Rig Cement
$
Investment amount, USD
Region Dnipro
Location Kryvyi Rig
Opportunity 30% - own funds 70% - raised financing
Status pre-feasibility study
Actions
Share project
Clinker kiln modernization project

Considering the operational landscape of Kryvyi Rig Cement, including the increasing demand for cement and the burgeoning alternative fuel market in Ukraine, alongside the accessibility of financing options such as loans from external entities for construction-related ventures, Kryvyi Rig Cement stands poised to embark on an investment initiative to renovate its current clinker kiln.

The purpose of the mentioned project is to modernize the kiln for burning alternative fuels and increase its productivity to 4 000 t/day (15% increase) to the maximum possible given the current design of the existing kiln.

The strategy of introducing alternative fuel at Kryvyi Rig Cement is planned to be implemented in 3 stages:

  • Stage 1 – AP: 2…5% replacement + Kiln capacity: 4 000 t/h, 4th quarter of 2024 – 4th quarter of 2025:

– Stage 1.1 – reaching 5%…10% replacement on the calciner:

– Stage 1.2 – increase kiln productivity to 4 000 t/day of clinker

  • Stage 2 – achievement of 20%…30% substitution on the calciner, 2026-2027
  • Stage 3 – achieving 50% or more substitution on the calciner, 2027-2029

Economic effect

The economic effect of project implementation arises as a result:

  • Replace ~45% of coal with RDF fuel (energy cost: coal – 6.0 USD/GJ (calorific value ~6 000 kcal/kg); RDF fuel – 4.2 USD/GJ (calorific value ~4 500 kcal/kg).
  • Due to the reduction of energy consumption for clinker firing from 3.4 to 3.2 GJ/t of clinker.

More opportunities in Dnipro region

Armed concrete production complex
Heavy Industry, Investment potential: 80,000$
Rebuild Ukraine
Heavy Industry, Investment potential: 80,000$
Complex for the production of flour and cereals products
Agriculture
Construction of 5 MW Solar Power Station (Mezyrytska TC))
Fuel and Energy, Investment potential: 5,600,000$
Fuel and Energy, Investment potential: 5,600,000$
Construction of a multifunctional trade and business complex
Construction, Investment potential: 6,670,000$
Rebuild Ukraine
Construction, Investment potential: 6,670,000$
Construction of a new cottage eco-town
Construction
Rebuild Ukraine
Construction

More opportunities in Fuel and Energy

Reconstruction of Sumy power station "Sumyteploenergo"
Sumy, Investment potential: 30,000,000$
Rebuild Ukraine
Sumy, Investment potential: 30,000,000$
Construction of a 6.5 MW solar power plant (to ensure the operation of electric transport)
Sumy, Investment potential: 6,500,000$
Rebuild Ukraine
Sumy, Investment potential: 6,500,000$
Regional Center for Energy Efficiency and Energy Management
Sumy, Investment potential: 28,000,000$
Rebuild Ukraine
Sumy, Investment potential: 28,000,000$
Construction of a Combined Heat and Power Plant Working on Biomass
Zhytomyr, Investment potential: 12,000,000$
Rebuild Ukraine
Zhytomyr, Investment potential: 12,000,000$
Construction of a Combined Heat and Power Plant Working on RDF Fuel and Biomass
Zhytomyr, Investment potential: 40,000,000$
Rebuild Ukraine
Zhytomyr, Investment potential: 40,000,000$

Invest in Ukraine now

In case you have any questions about the Investment Map or would like to receive advice on investment opportunities, please contact us at  [email protected]